Keep Back Turbulent Water in Minneapolis
May 2015 — Sign reading "Keep Back 500 FT Turbulent Water" seen on the Mississippi River in Downtown Minneapolis.
Explore photos tagged Minneapolis.
May 2015 — Sign reading "Keep Back 500 FT Turbulent Water" seen on the Mississippi River in Downtown Minneapolis.
May 2015 — The Ardent Mills facility in Hastings, MN was the first operating mill in Minnesota. Per the company, the purifier, patent barrel and graham flour were invented here.
May 2015 — The Ardent Mills facility in Hastings, MN was the first operating mill in Minnesota. Per the company, the purifier, patent barrel and graham flour were invented here.
May 2015 — The Ardent Mills facility in Hastings, MN was the first operating mill in Minnesota. Per the company, the purifier, patent barrel and graham flour were invented here.
June 2015 — Minneapolis City Hall in downtown Minneapolis.
July 2015 — Chicago Architecture and Lake Michigan
July 2015 — U.S. Bank Stadium, home of the Minnesota Vikings, began construction in December 2013 on the site of the former Hubert H. Humphrey Metrodome in downtown Minneapolis. The stadium’s steel skeleton, seen here during its mid-construction phase, showcases the dramatic angular geometry that defines its final form — a nod to both Nordic shipbuilding and Minnesota’s icy winter landscapes. The project, designed by HKS Architects and constructed by Mortenson, features over 19,000 tons of structural steel and spans 1.75 million square feet. Its transparent ETFE roof panels and vast steel trusses were among the most complex structural assemblies ever attempted in a U.S. stadium build. Completed in 2016, the $1.1 billion stadium remains one of the most technically ambitious indoor venues in North America, notable for its fixed-roof design, massive glass curtain walls, and precision-engineered support cranes like the red lattice boom seen here — used to hoist the roof trusses into place during overnight construction sessions.
July 2015 — Construction of the Wells Fargo towers in Downtown East in Minneapolis, July 2015.
July 2015 — Solar panels on a rooftop in downtown Minneapolis.
August 2015 — Demolition of the Star Tribune building in downtown Minneapolis. The building was razed to make room for construction of US Bank Stadium and the nearby area.
August 2015 — The Capella Tower in Downtown Minneapolis. The Hennepin County Government Center on the right.
October 2015 — The Downtown Minneapolis core.
January 2016 — ADM Grain Elevator and Harris Machinery in the front. Harris Machinery covered in ice after a large fire gutted in the inside. Located in Prospect Park, Minneapolis.
February 2016 — Repairs being done on the Franklin Avenue bridge in Minneapolis.