Snow Falling Over New Minneapolis Train Station
December 2025 — Really pretty snow tonight in Minneapolis. Here's the new West Lake Street train station, with the orange still continuing to grow on me. I'm not there yet.. but getting closer.
Explore photos tagged Southwest LRT.
December 2025 — Really pretty snow tonight in Minneapolis. Here's the new West Lake Street train station, with the orange still continuing to grow on me. I'm not there yet.. but getting closer.
November 2025 — Lit up Bassett Creek Valley Station in Minneapolis. The new train station is part of the Southwest LRT Green Line extension operated by Metro Transit.
November 2025 — West Lake Street Station is part of the Southwest Light Rail Transit (Green Line Extension), an extension of Meto Transit's Green Line LRT.
October 2025 — The new rails of the Metro Transit Southwest LRT green line extension. Lake of the Isles, Bde Maka Ska and Cedar Lake.
October 2025 — Light rail vehicle leaves the West Lake Street Station for the first time. This morning Metro Transit towed a light rail vehicle through the line for the first time doing basic clearance testing. Construction on the green line extension began in 2018 and is set to open to passengers in 2027.
October 2025 — First light rail vehicle through the Kenilworth tunnel. This morning Metro Transit towed a light rail vehicle through the line for the first time doing basic clearance testing. Construction on the green line extension began in 2018 and is set to open to passengers in 2027.
October 2025 — Light rail vehicle on the bridge at the Kenilworth Channel. This morning Metro Transit towed a light rail vehicle through the line for the first time doing basic clearance testing. Construction on the green line extension began in 2018 and is set to open to passengers in 2027.
October 2025 — Metro Transit light rail vehicle at the W 21st Street Station in Minneapolis for the very first time. This morning Metro Transit towed a light rail vehicle through the line for the first time doing basic clearance testing. Construction on the green line extension began in 2018 and is set to open to passengers in 2027.
October 2025 — New bench installed on the Cedar Lake Trail in Minneapolis. The trail was rebuilt following construction of the new green line extension light rail project.
October 2025 — Siemens Type III S700 with Light Rail Happening Now testing wrap. The train car will be part of the new Southwest LRT Green Line Extension set to open in 2017.
September 2025 — Construction on the Lake Street Station of the new light rail line in Minneapolis. The Green Line is being extended to Eden Prairie.
June 2025 — Canadian wildfire smoke making downtown skyline barely visible from the Lake Street Station.
March 2025 — Sunset behind Bryn Mawr Station in Minneapolis. The train station will be used by the Metro Transit green line extension.
September 2024 — Metro Transit's Southwest LRT tunnel being constructed, as seen from the Midtown Greenway.
June 2024 — The half mile Kenilworth LRT tunnel, part of the new Green Line train extension, tonight as storms move through just north of Minneapolis. (Calhoun Isles, Minneapolis June 2024)
June 2024 — The views from the new Green Line Extension are going to be pretty great! Like this one between Royalston/Farmers Market Station and Target Field Station.
March 2024 — The new Bassett Creek Valley Station connection to Van White Memorial Boulevard looking nice as it nears completion. Only a few more years before you'll be able to catch a train here... (Minneapolis, March 2024)
August 2023 — Bryn Mawr Station construction in Minneapolis. The station is part of the new Southwest Green Line light rail extension from Minneapolis to the western suburbs.
July 2023 — Construction on the Southwest LRT train project in South Minneapolis.
June 2019 — A tracked John Deere feller buncher with a yellow cutting head sits idle beside the Cedar Lake Trail in St. Louis Park, Minnesota, during early site preparation for the Southwest Light Rail Transit (LRT) extension. The machine’s “KEEP BACK 300 FT / 90 M” arm warning and the trail’s closed fencing mark the transition from a popular cycling route to an active construction corridor. In the distance, the bridge approach and industrial structures hint at the scale of redevelopment that reshaped the rail and trail landscape through Minneapolis’s western suburbs.
May 2019 — A detour sign for the Southwest Light Rail Transit (SWLRT) project stands beside a bike trail in Minneapolis, showing the rerouted path for cyclists and pedestrians during construction of the Green Line Extension. The detailed map outlines temporary closures through the Kenilworth Corridor and Cedar Lake areas, where new light rail tracks are being installed to connect downtown Minneapolis with the southwestern suburbs. The project, one of the largest public works efforts in Minnesota history, has significantly altered popular urban trails like the Midtown Greenway and Cedar Lake Trail since construction began in the late 2010s.