Formwork Tower for the Green Line Extension Bridge over Highway 100
Taken September 2019
The Green Line Extension is a light rail project adding 14.5 miles of track between Minneapolis and Eatan Prairie, with a bridge crossing over Highway 100 in St. Louis Park as one of its structures. Metro Transit and the Metropolitan Council oversee the project, which extends the existing Green Line that currently runs between Minneapolis and Saint Paul. Formwork and shoring towers built from wood and steel supports are standard methods for pouring concrete bridge decks and piers during highway-spanning construction like this.
Taken September 2019
More from
METRO Green Line Extension (Southwest LRT)
Passengers Boarding a Green Line Train at Louisiana Station
People check out new Metro Green Line Extension trains at Louisiana Station where Metro Transit announced June 12, 2027 as…
Swag From the Green Line Extension Announcement at Louisiana Station
Items handed out at the Metro Transit Green Line Extension opening date event at Louisiana Station. Metro Transit says the…
Trail Detour Near the Kenilworth and Midtown Greenway Junction
The Kenilworth Trail at the Midtoiwn Greeenway pictured in June 2019.
Fenced-Off Section of the Midtown Greenway at Night
Construction fencing lines a section of the Midtown Greenway corridor in Minneapolis during work associated with the Southwest Light Rail…
Steaming Mulch Piles Along the Midtown Greenway at Night
Steaming mulch seen on the Midtown Greenway during Metro Transit's light rail construction work.
Test Train Crosses Above West Lake Street Station at Night
The West Lake Street Station in Minneapolis. The new train station on the Green Line Extension will have passengers beginning…



