Metro Green Line Extension

Explore photos tagged Metro Green Line Extension.

Heavy fog on Cedar Lake Trail at Bryn Mawr Station

Heavy fog on Cedar Lake Trail at Bryn Mawr Station

September 2026 —

Overhead Catenary Along the Kenilworth Corridor at Night

Overhead Catenary Along the Kenilworth Corridor at Night

September 2026 —

Metro Green Line Extension Loot

Metro Green Line Extension Loot

September 2026 —

Biker goes through Cedar Lake Trail Tunnel, Louisiana Station

Biker goes through Cedar Lake Trail Tunnel, Louisiana Station

September 2026 —

Metro Transit Green Line test train at Louisiana Station

Metro Transit Green Line test train at Louisiana Station

September 2026 —

St. Louis Park Mayor Nadia Mohamed speaks at Green Line Event

St. Louis Park Mayor Nadia Mohamed speaks at Green Line Event

September 2026 —

Hennepin County Commissioner Marion Greene at Green Line Event

Hennepin County Commissioner Marion Greene at Green Line Event

September 2026 —

Metro Transit Is Moving Forward shirt at Green Line Event

Metro Transit Is Moving Forward shirt at Green Line Event

September 2026 —

Hennepin County Commissioner Irene Fernando speaks at Metro Transit Event

Hennepin County Commissioner Irene Fernando speaks at Metro Transit Event

September 2026 —

Metro Transit Announces Metro Green Line Opening Date

Metro Transit Announces Metro Green Line Opening Date

September 2026 —

Metro Green Line Opening Date Announcement Sign

Metro Green Line Opening Date Announcement Sign

September 2026 —

Metro Transit Test Train 313A at the Bassett Creek Valley Station

Metro Transit Test Train 313A at the Bassett Creek Valley Station

August 2026 —

Metro Transit Test Train 313A near Bryn Mawr Station

Metro Transit Test Train 313A near Bryn Mawr Station

August 2026 —

Metro Transit Test Train 313A at the Royalston Station

Metro Transit Test Train 313A at the Royalston Station

August 2026 —

Metro Transit West Lake Street Station, Minneapolis

Metro Transit West Lake Street Station, Minneapolis

June 2026 —

Metro Transit Train Testing in Minneapolis

Metro Transit Train Testing in Minneapolis

May 2026 —

Rail Tie Plate Marked 2-2768T, Southwest LRT, Minneapolis

Rail Tie Plate Marked 2-2768T, Southwest LRT, Minneapolis

May 2026 —

Railroad Crossing at Bassett Creek Valley Station

Railroad Crossing at Bassett Creek Valley Station

November 2025 — Lit up Bassett Creek Valley Station in Minneapolis. The new train station is part of the Southwest LRT Green Line extension operated by Metro Transit.

West Lake Street Station LRT Construction at Night

West Lake Street Station LRT Construction at Night

November 2025 — West Lake Street Station is part of the Southwest Light Rail Transit (Green Line Extension), an extension of Meto Transit's Green Line LRT.

Northern Lights over West 21st Train Station, Minneapolis

Northern Lights over West 21st Train Station, Minneapolis

November 2025 — Vivid northern lights over the West 21st Street train station in Minneapolis.

Southwest LRT Train Emerges from the Kenilworth Tunnel in Fall

Southwest LRT Train Emerges from the Kenilworth Tunnel in Fall

October 2025 — First light rail vehicle through the Kenilworth tunnel. This morning Metro Transit towed a light rail vehicle through the line for the first time doing basic clearance testing. Construction on the green line extension began in 2018 and is set to open to passengers in 2027.

“Opens 2027” Test Train Crosses the Kenilworth Channel Bridge

“Opens 2027” Test Train Crosses the Kenilworth Channel Bridge

October 2025 — Light rail vehicle on the bridge at the Kenilworth Channel. This morning Metro Transit towed a light rail vehicle through the line for the first time doing basic clearance testing. Construction on the green line extension began in 2018 and is set to open to passengers in 2027.

Metro Transit Light Rail Clearance Test at W 21st Street Station

Metro Transit Light Rail Clearance Test at W 21st Street Station

October 2025 — Metro Transit light rail vehicle at the W 21st Street Station in Minneapolis for the very first time. This morning Metro Transit towed a light rail vehicle through the line for the first time doing basic clearance testing. Construction on the green line extension began in 2018 and is set to open to passengers in 2027.

Metro Transit Siemens S700 SWLRT LRV

Metro Transit Siemens S700 SWLRT LRV

October 2025 — Siemens Type III S700 with Light Rail Happening Now testing wrap. The train car will be part of the new Southwest LRT Green Line Extension set to open in 2017.

Midtown Greenway Lake Street Light Rail Station

Midtown Greenway Lake Street Light Rail Station

September 2025 — Construction on the Lake Street Station of the new light rail line in Minneapolis. The Green Line is being extended to Eden Prairie.

Bryn Mawr Station on the Metro Transit Green Line Extension in Minneapolis

Bryn Mawr Station on the Metro Transit Green Line Extension in Minneapolis

July 2025 —

Cedar Lake Trail and Bryn Mawr Station

Cedar Lake Trail and Bryn Mawr Station

July 2025 —

Sunset Reflections at Bryn Mawr Station Construction Site

Sunset Reflections at Bryn Mawr Station Construction Site

March 2025 — Sunset behind Bryn Mawr Station in Minneapolis. The train station will be used by the Metro Transit green line extension.

Aerial View of Kenilworth Tunnel Construction Near Downtown Minneapolis

Aerial View of Kenilworth Tunnel Construction Near Downtown Minneapolis

June 2024 — The half mile Kenilworth LRT tunnel, part of the new Green Line train extension, tonight as storms move through just north of Minneapolis. (Calhoun Isles, Minneapolis June 2024)

Bassett Creek Valley LRT Station nears completion in Minneapolis

Bassett Creek Valley LRT Station nears completion in Minneapolis

March 2024 — The new Bassett Creek Valley Station connection to Van White Memorial Boulevard looking nice as it nears completion. Only a few more years before you'll be able to catch a train here... (Minneapolis, March 2024)

Welders at Night, Southwest LRT Green Line Extension Construction

Welders at Night, Southwest LRT Green Line Extension Construction

November 2023 —

Overgrown Bike and Pedestrian Detour on the Cedar Lake Trail

Overgrown Bike and Pedestrian Detour on the Cedar Lake Trail

August 2023 —

Kenilworth Trail Tunnel Excavation, Southwest LRT, Minneapolis

Kenilworth Trail Tunnel Excavation, Southwest LRT, Minneapolis

June 2023 —

Metro Green Line Extension Construction Along the Kenilworth Corridor

Metro Green Line Extension Construction Along the Kenilworth Corridor

April 2022 —

Construction at the Lake Street Bridge Over the Midtown Greenway

Construction at the Lake Street Bridge Over the Midtown Greenway

August 2020 —

Metro Green Line Extension Construction Staging Along the Kenilworth Corridor

Metro Green Line Extension Construction Staging Along the Kenilworth Corridor

July 2020 —

Formwork Shoring on the Southwest LRT Bridge Over Excelsior Blvd

Formwork Shoring on the Southwest LRT Bridge Over Excelsior Blvd

May 2020 —

Night Construction of the Cedar Lake Trail Tunnel at Wooddale Avenue

Night Construction of the Cedar Lake Trail Tunnel at Wooddale Avenue

May 2020 —

Cedar Lake Trail Near the Green Line Extension in St. Louis Park

Cedar Lake Trail Near the Green Line Extension in St. Louis Park

October 2019 —

Stacked Concrete Panels for a Railroad Crossing Rebuild

Stacked Concrete Panels for a Railroad Crossing Rebuild

September 2019 —

Bridge Construction Along the Kenilworth Channel

Bridge Construction Along the Kenilworth Channel

September 2019 —

Green Line Extension Bridge Construction over Highway 100, St. Louis Park

Green Line Extension Bridge Construction over Highway 100, St. Louis Park

September 2019 —

Cedar Lake Trail Light Rail Construction, Burnham Road

Cedar Lake Trail Light Rail Construction, Burnham Road

August 2019 —

Cedar Lake Trail Torn Up Near a Bridge During LRT Construction

Cedar Lake Trail Torn Up Near a Bridge During LRT Construction

July 2019 —

Kenilworth Trail Construction in July 2019

Kenilworth Trail Construction in July 2019

July 2019 —

Kenilworth Trail During Light Rail Construction in July 2019

Kenilworth Trail During Light Rail Construction in July 2019

July 2019 —

A Wooded Stretch of the Kenilworth Trail

A Wooded Stretch of the Kenilworth Trail

July 2019 —

Rail Tie Replacement Along the Kenilworth Trail Corridor

Rail Tie Replacement Along the Kenilworth Trail Corridor

July 2019 —

Safety Fencing Along the Kenilworth Trail Rail Corridor

Safety Fencing Along the Kenilworth Trail Rail Corridor

July 2019 —

Decking Removed from the Cedar Lake Channel Bridge on the Burnham Trail

Decking Removed from the Cedar Lake Channel Bridge on the Burnham Trail

July 2019 —

Cleared Kenilworth Trail Corridor Near Condo Towers in Minneapolis

Cleared Kenilworth Trail Corridor Near Condo Towers in Minneapolis

July 2019 —

Burnham Trail during Light Rail construction June 2019

Burnham Trail during Light Rail construction June 2019

June 2019 —

Steaming Mulch on Midtown Greenway

Steaming Mulch on Midtown Greenway

June 2019 —

John Deere 843L Feller Buncher – Southwest LRT Construction

John Deere 843L Feller Buncher – Southwest LRT Construction

June 2019 — A John Deere 843L feller buncher sits parked near the railway tracks in St. Louis Park, Minnesota, during the early stages of construction for the Southwest Light Rail Transit (LRT) project. Designed primarily for forestry work, this heavy-duty machine—with its massive front grapple and thick treaded tires—was adapted for clearing brush and trees along the rail corridor. The mix of heavy equipment, rail infrastructure, and suburban backdrop highlights the region’s ongoing transformation as the light rail expansion reshapes Minneapolis’s western suburbs.

Metro Transit Louisiana Avenue Light Rail Station

Metro Transit Louisiana Avenue Light Rail Station

June 2019 —

Kenilworth Trail at Midtown Greenway, June 2019

Kenilworth Trail at Midtown Greenway, June 2019

June 2019 —

Rail Crew Works the Beltline Boulevard Crossing in St. Louis Park

Rail Crew Works the Beltline Boulevard Crossing in St. Louis Park

May 2019 —

Rail Maintenance Equipment Along the Southwest LRT Corridor in St. Louis Park

Rail Maintenance Equipment Along the Southwest LRT Corridor in St. Louis Park

May 2019 —

Rail Loader Crew Works on the Southwest LRT Line in St. Louis Park

Rail Loader Crew Works on the Southwest LRT Line in St. Louis Park

May 2019 —

Rail Cars Hauling New Track for the Green Line Extension

Rail Cars Hauling New Track for the Green Line Extension

May 2019 —

Cedar Lake Trail, St. Louis Park: Water Tower and Grain Elevators

Cedar Lake Trail, St. Louis Park: Water Tower and Grain Elevators

September 2017 — The Cedar Lake Trail passes through the industrial district of St. Louis Park, Minnesota, illuminated here by the community’s water tower and nearby grain elevators. This segment of the trail follows a former railroad right-of-way once used by the Minneapolis & St. Louis Railway, which connected local industries to the region’s freight network. The corridor’s transformation into one of the country’s first bicycle “freeways” in the 1990s marked a major milestone in urban redevelopment and sustainable transportation planning. Once lined with lumberyards, steel fabricators, and mills, the area surrounding the trail reflects the industrial origins of St. Louis Park—a community that grew rapidly in the early 20th century due to its proximity to both Minneapolis and key rail junctions. The trail today bridges that history, offering cyclists and commuters a route through a landscape where freight trains, utility towers, and legacy industry remain active reminders of the city’s manufacturing past.

Built in Minneapolis

Minneapolis Photographer

Browse by location, move through long-running series, or start with recent work.