Rail Maintenance Equipment Along the Southwest LRT Corridor in St. Louis Park
Taken May 2019
The Southwest LRT, also known as the Green Line Extension, is a light rail project extending Metro Transit's existing Green Line roughly 14.5 miles from Minneapolis through St. Louis Park, Hopkins, Minnetonka, and Eden Prairie. Construction has required extensive work on existing freight rail corridors, including track realignment and maintenance to accommodate shared and adjacent rail lines. The project is being built and overseen by the Metropolitan Council, with completion delayed multiple times past its original targeted opening.
Taken May 2019
More from
METRO Green Line Extension (Southwest LRT)
Crane Work Over the Kenilworth Trail Excavation Site
The Southwest Light Rail Transit (SWLRT) line runs through a below-grade corridor along the Kenilworth Trail in Minneapolis, connecting the…
Cedar Lake Regional Trail Light Rail Construction
Ripped up Cedar Lake Trail during the METRO Green Line Extension construction. Seen in Juily 2019.
Safety Fencing Along the Kenilworth Trail Rail Corridor
The Kenilworth Trail runs alongside active freight and light-rail tracks through the Kenilworth Corridor, a narrow strip of land connecting…
Future Louisiana Station Site Before Green Line Extension Construction
Metro Transit Louisiana Avenue Green Line Light Rail station prior to construction.
Bryn Mawr Station Platform Under Construction at Dusk
Bryn Mawr Station in Minneapolis is shown at sunset. This station is a part of the Metro Transit Green Line…
Test Train 313A Approaches Royalston Station on the Green Line Extension
Metro Transit Test Train 313A moves between Royalston Ave and Bryn Mawr Station on the new Green Line Extension route.…