Rail Loader Crew Works on the Southwest LRT Line in St. Louis Park
Taken May 2019
Crews working the Southwest LRT line in St. Louis Park use a rail loader car, a flatbed-mounted machine that threads long steel rails off a train and positions them along the roadbed for installation. The Southwest LRT, known operationally as the Green Line Extension, is a Metropolitan Council project extending light rail service roughly 14.5 miles from Minneapolis through St. Louis Park, Hopkins, Minnetonka, and Eden Prairie. The line runs largely along former freight corridors, requiring extensive new track construction rather than simple conversion of existing rail. Rail-loading equipment like this allows crews to deliver continuous welded rail sections directly to the grade, reducing the need for separate hauling and placement steps during construction.
Taken May 2019
More from
METRO Green Line Extension (Southwest LRT)
A Wooded Stretch of the Kenilworth Trail
The Kenilworth Trail runs through the Kenilworth corridor connecting the Chain of Lakes area with downtown Minneapolis, following a former…
Southwest LRT Trail Detour Sign, Minneapolis
A "Trail Detour" sign provides navigation for cyclists and pedestrians around construction for the Southwest Light Rail Transit (SWLRT) project…
Southwest LRT Line Under Construction Near Bde Maka Ska in Fall
The new rails of the Metro Transit Southwest LRT green line extension. Lake of the Isles, Bde Maka Ska and…
Formwork Tower for the Green Line Extension Bridge over Highway 100
The Green Line Extension is a light rail project adding 14.5 miles of track between Minneapolis and Eatan Prairie, with…
John Deere Feller Buncher at Southwest LRT Construction, St. Louis Park
A John Deere feller buncher, a heavy-duty forestry machine, is parked at the Southwest Light Rail Transit (LRT) construction site…
"Metro Transit Is Moving Forward" Hoodie at Green Line Announcement
A Metro Transit Is Moving Forward sweatshirt at the Metro Transit event announcing the opening date of the Green Line…



