Test Train 313A Departs Royalston Station on the Green Line Extension
Taken
Taken
Metro Transit Test Train 313A moves between Royalston Ave and Bryn Mawr Station on the new Green Line Extension route. The new train line is set to open in 2027 after almost a decade of construction.
Taken
More from
METRO Green Line Extension (Southwest LRT)
Bryn Mawr Station at Dusk During Green Line Extension Construction
Bryn Mawr Station in Minneapolis is shown during final construction on the Metro Transit Green Line Extension, also known as…
Burnham Road and Cedar Lake Parkway, SWLRT
METRO Green Line Extension construction at Burnham Road and Cedar Lake Parkway. Preparation for the cut and cover tunnel for…
Rail Loader Crew Works on the Southwest LRT Line in St. Louis Park
Crews working the Southwest LRT line in St. Louis Park use a rail loader car, a flatbed-mounted machine that threads…
Metro Green Line Extension Construction Along the Kenilworth Corridor
Construction along the Midtown Greenway of what will become the Kenilworth Tunnel and West Lake Street Station. The construction is…
"Opens 2027" Test Train Crosses the Kenilworth Channel Bridge
A Metro Transit light rail vehicle crosses the Kenilworth Channel bridge in Minneapolis during testing for the Southwest LRT extension.…
Track Switches at Sunset Along the METRO Green Line Extension
Construction of the METRO Green Line Extension, also known as the Southwest Light Rail Transit (SWLRT) project, is underway in…



