Test Train 313A Approaches Royalston Station on the Green Line Extension
Taken
Taken
Metro Transit Test Train 313A moves between Royalston Ave and Bryn Mawr Station on the new Green Line Extension route. The new train line is set to open in 2027 after almost a decade of construction.
Taken
More from
METRO Green Line Extension (Southwest LRT)
Southwest LRT Line Under Construction Near Bde Maka Ska in Fall
The new rails of the Metro Transit Southwest LRT green line extension. Lake of the Isles, Bde Maka Ska and…
"Stay Safe!" Banner at West Lake Street Station Ahead of Green Line Testing
West Lake Street Station in Minneapolis is shown during pre-opening work on Metro Transit's Green Line Extension, with a safety…
Rail Loader Crew Works on the Southwest LRT Line in St. Louis Park
Crews working the Southwest LRT line in St. Louis Park use a rail loader car, a flatbed-mounted machine that threads…
Cedar Lake Trail Closing and a Freight Train
A freight train travels down the freight rails during the early days of the Metro Green Line Extension project.
Kenilworth Trail Bridge Deconstruction
Kenilworth trail bridge over the Cedar Lake to Lake of the Isles channel being dismantled during Metro Green Line Extension…
Stacked Concrete Panels for a Railroad Crossing Rebuild
Precast concrete panels like these form the running surface of a railroad grade crossing, fitting between and alongside the rails…



