Rail Tie Replacement Along the Kenilworth Trail Corridor
Taken July 2019
The Kenilworth Trail follows a former Milwaukee Road rail corridor connecting Minneapolis's Cedar Lake and Lake of the Isles areas to Hopkins. The corridor has been used for freight rail, bike and pedestrian paths, and is the planned route for the Metro Green Line Extension light rail. Construction crews have used the rail line for staging materials, including ties and ballast, during the extension's preliminary work. A Grove mobile crane, commonly used for lifting rail and bridge components, appears among the equipment staged along the tracks.
Taken July 2019
More from
METRO Green Line Extension (Southwest LRT)
Trail Detour Near the Kenilworth and Midtown Greenway Junction
The Kenilworth Trail at the Midtoiwn Greeenway pictured in June 2019.
Formwork Shoring on the Southwest LRT Bridge Over Excelsior Blvd
This bridge carries the Southwest Light Rail Transit extension, also known as the Green Line Extension, over Excelsior Boulevard in…
Construction at the Lake Street Bridge Over the Midtown Greenway
The Midtown Greenway runs along a former Milwaukee Road rail corridor that was converted into a pedestrian and bicycle trail…
Future Louisiana Station Site Before Green Line Extension Construction
Metro Transit Louisiana Avenue Green Line Light Rail station prior to construction.
Catenary Lines Curve Through the Kenilworth Corridor at Night
The Kenilworth Corridor carries freight and light-rail traffic through a narrow right-of-way linking Minneapolis's Chain of Lakes area to downtown.…
Fenced-Off Kenilworth Trail Corridor Awaiting LRT Construction
The Kenilworth Trail construction seen on July 23, 2019. The trail was closed for years