Grove Crane Staged on the Kenilworth Trail for Southwest LRT Work
Taken July 2019
This Grove RT600E rough-terrain crane, operated by C.S. McCrossan, was staged along the Kenilworth Trail during construction of Metro Transit's Southwest LRT Green Line Extension. The crane can lift up to 60 tons and extend a boom beyond 100 feet, making it suited for setting bridge and tunnel components along the corridor. The Kenilworth corridor carries freight rail and a recreational trail between the Chain of Lakes and downtown Minneapolis, and became a major staging area for the light-rail line's tunnel and bridge work. C.S. McCrossan, a Minnesota-based heavy civil contractor, has worked on multiple segments of the Southwest LRT project.
Taken July 2019
More from
METRO Green Line Extension (Southwest LRT)
Light Rail Clearance Testing at W 21st Street Station
A Metro Transit light rail vehicle is stopped at W 21st Street Station in Minneapolis during clearance testing for the…
Cedar Lake Trail Closing and a Freight Train
A freight train travels down the freight rails during the early days of the Metro Green Line Extension project.
Metro Green Line Extension Construction Staging Along the Kenilworth Corridor
The Kenilworth Corridor carries freight rail, the Kenilworth bike and walking trail, and now the Southwest Light Rail Transit extension…
Southwest LRT Train 108B Waits at the Platform in Eden Prairie
Southwest Station is a stop on Metro Transit's Green Line Extension, a light rail line linking downtown Minneapolis to Eden…
Steaming Mulch Piles Along the Midtown Greenway at Night
Steaming mulch seen on the Midtown Greenway during Metro Transit's light rail construction work.
Cedar Lake Trail closing over Minnehaha Creek
The bridge over Minnehaha Creek on the Cedar Lake Trail during Metro Green Line Extension construction.



