Light Rail Testing at Sunset on the Green Line Extension
Taken
Taken
A Siemens S700 light rail vehicle for Metro Transit’s Green Line Extension passes beneath a cable-stayed station canopy in Minneapolis. The car is wrapped with “Light Rail Testing Happening Now” and GreenLineExt.org graphics promoting public awareness during testing for the Southwest LRT project. The train is identified as car 316A, part of the new fleet ordered for the extension of the Green Line.
Taken
More from
METRO Green Line Extension (Southwest LRT)
Bryn Mawr Station at Dusk During Green Line Extension Construction
Bryn Mawr Station in Minneapolis is shown during final construction on the Metro Transit Green Line Extension, also known as…
Rail Loader Crew Works on the Southwest LRT Line in St. Louis Park
Crews working the Southwest LRT line in St. Louis Park use a rail loader car, a flatbed-mounted machine that threads…
Bridge Construction Along the Kenilworth Channel
The Kenilworth Channel connects Cedar Lake and Lake of the Isles in Minneapolis, carrying both water traffic and the Kenilworth…
John Deere Feller Buncher at Southwest LRT Construction, St. Louis Park
A John Deere feller buncher, a heavy-duty forestry machine, is parked at the Southwest Light Rail Transit (LRT) construction site…
Lit up West Lake Street Station Train Station
West Lake Street Station is a METRO Green Line Extension stop in Minneapolis, built next to the Midtown Greenway just…
Kenilworth Tunnel Construction Sign for Green Line Extension
A Lunda/C.S. McCrossan JV sign directing workers to the Kenilworth Tunnel in Minneapolis. The tunnel is part of the Metro…