METRO Green Line Extension (Southwest LRT)
Photography of the construction of Minnesota's largest infrastructure project.
The METRO Green Line Extension, also known as the Southwest LRT, is a major light rail project in Minneapolis and its western suburbs. Construction began in 2018 to extend Green Line service westward, with passenger operations planned for 2027. This photo set documents clearance and systems testing across key segments, including the Kenilworth Tunnel and Kenilworth Channel bridge, and stations such as West Lake Street, West 21st Street, Southwest Station, and Bassett Creek Valley.
The extension is intended to connect communities and provide efficient public transportation in the region. Clearance tests confirm train envelopes, platform spacing, and structure interfaces before public service, reflecting the integration of new Siemens S700 light rail vehicles. Engineering features like the tunnel and channel crossing allow the line to traverse constrained corridors while meeting safety and reliability requirements.
Southwest Station functions as a transit hub along the corridor, while stations at West Lake Street, West 21st Street, and Bassett Creek Valley serve nearby neighborhoods and transfer points. Night construction and station finishing progressed alongside test runs in late 2025, preparing the line for passenger service targeted for 2027. The extension is designed to integrate with Metro Transit’s existing network to expand rail access in the Minneapolis area.
View full post: Heavy fog on Cedar Lake Trail at Bryn Mawr Station
View full post: Metro Green Line Extension Loot
View full post: Biker goes through Cedar Lake Trail Tunnel, Louisiana Station
View full post: Metro Transit Green Line test train at Louisiana Station
View full post: St. Louis Park Mayor Nadia Mohamed speaks at Green Line Event
View full post: Hennepin County Commissioner Marion Greene at Green Line Event
View full post: Metro Transit Is Moving Forward shirt at Green Line Event
View full post: Hennepin County Commissioner Irene Fernando speaks at Metro Transit Event
View full post: Metro Transit Announces Metro Green Line Opening Date
View full post: Overhead Catenary Along the Kenilworth Corridor at Night
View full post: Metro Green Line Opening Date Announcement Sign
View full post: Metro Transit Test Train 313A at the Royalston Station
View full post: Metro Transit Test Train 313A at the Bassett Creek Valley Station
View full post: Metro Transit Test Train 313A near Bryn Mawr Station
View full post: Metro Transit West Lake Street Station, Minneapolis
View full post: Metro Transit Train Testing in Minneapolis
View full post: Rail Tie Plate Marked 2-2768T, Southwest LRT, Minneapolis
View full post: Railroad Crossing at Bassett Creek Valley Station
View full post: West Lake Street Station LRT Construction at Night
View full post: Northern Lights over West 21st Train Station, Minneapolis
View full post: Green Line Extension Train at SouthWest Station
View full post: Light Rail Train 108B at Southwest Station Platform
View full post: Southwest LRT train tests at West Lake Street Station, Minneapolis
View full post: Southwest LRT Train Emerges from the Kenilworth Tunnel in Fall
View full post: “Opens 2027” Test Train Crosses the Kenilworth Channel Bridge
View full post: Metro Transit Light Rail Clearance Test at W 21st Street Station
View full post: Metro Transit Siemens S700 SWLRT LRV
View full post: Midtown Greenway Lake Street Light Rail Station
View full post: Bryn Mawr Station on the Metro Transit Green Line Extension in Minneapolis
View full post: Cedar Lake Trail and Bryn Mawr Station
View full post: Sunset Reflections at Bryn Mawr Station Construction Site
View full post: Aerial View of Kenilworth Tunnel Construction Near Downtown Minneapolis
View full post: Bassett Creek Valley LRT Station nears completion in Minneapolis
View full post: Welders at Night, Southwest LRT Green Line Extension Construction
View full post: Overgrown Bike and Pedestrian Detour on the Cedar Lake Trail
View full post: Kenilworth Trail Tunnel Excavation, Southwest LRT, Minneapolis
View full post: Construction at the Lake Street Bridge Over the Midtown Greenway
View full post: Metro Green Line Extension Construction Staging Along the Kenilworth Corridor
View full post: Formwork Shoring on the Southwest LRT Bridge Over Excelsior Blvd
View full post: Night Construction of the Cedar Lake Trail Tunnel at Wooddale Avenue
View full post: Cedar Lake Trail Near the Green Line Extension in St. Louis Park
View full post: Stacked Concrete Panels for a Railroad Crossing Rebuild
View full post: Bridge Construction Along the Kenilworth Channel
View full post: Green Line Extension Bridge Construction over Highway 100, St. Louis Park
View full post: Cedar Lake Trail Light Rail Construction, Burnham Road
View full post: Kenilworth Trail Construction in July 2019
View full post: Kenilworth Trail During Light Rail Construction in July 2019
View full post: Cedar Lake Trail Torn Up Near a Bridge During LRT Construction
View full post: A Wooded Stretch of the Kenilworth Trail
View full post: Decking Removed from the Cedar Lake Channel Bridge on the Burnham Trail
View full post: Rail Tie Replacement Along the Kenilworth Trail Corridor
View full post: Safety Fencing Along the Kenilworth Trail Rail Corridor
View full post: Grove Crane Staged on the Kenilworth Trail for Southwest LRT Work
View full post: Cleared Kenilworth Trail Corridor Near Condo Towers in Minneapolis
View full post: Steaming Mulch on Midtown Greenway
View full post: Burnham Trail during Light Rail construction June 2019
View full post: John Deere 843L Feller Buncher – Southwest LRT Construction
View full post: Metro Transit Louisiana Avenue Light Rail Station
View full post: Kenilworth Trail at Midtown Greenway, June 2019
View full post: Rail Crew Works the Beltline Boulevard Crossing in St. Louis Park
View full post: Rail Maintenance Equipment Along the Southwest LRT Corridor in St. Louis Park
View full post: Rail Loader Crew Works on the Southwest LRT Line in St. Louis Park
View full post: Rail Cars Hauling New Track for the Green Line Extension
View full post: Cedar Lake Trail, St. Louis Park: Water Tower and Grain Elevators