Map
More from Midtown Greenway
Midtown Greenway, Minneapolis, May 2022
The Midtown Greenway, a 5.5-mile paved urban trail in Minneapolis, follows a former railroad corridor. This section near 10th Avenue…
December on the Midtown Greenway
A winter scene along the Midtown Greenway, the 5.5-mile rail-to-trail corridor that runs through the heart of Minneapolis. The trench…
Push For Help on Midtown Greenway
A Push For Help sign on the Midtown Greenway in Minneapolis.
John Deere Feller Buncher at Southwest LRT Construction, St. Louis Park
A John Deere feller buncher, a heavy-duty forestry machine, is parked at the Southwest Light Rail Transit (LRT) construction site…
Graffiti 'Replace RBG With Nobody' on Midtown Greenway, Minneapolis
Graffiti reading “Replace RBG With fucking nobody” is painted on a wall along the Midtown Greenway in Minneapolis. The message…
Jogger on Midtown Greenway, Minneapolis, After Rain
A lone jogger uses the Midtown Greenway in Minneapolis after a rain shower. This 5.7-mile paved trail follows the path…
Nearby Photos



