Map
More from I-35W Stormwater Storage Facility
Twin CAT Excavators Inside Blasted Tunnel at I-35W Stormwater Facility
This tunnel is part of the I-35W stormwater storage facility, a Minnesota Department of Transportation project built to hold runoff…
Excavator Beside Rubble in I-35W Stormwater Tunnel, Minneapolis
The I-35W Stormwater Storage Facility is a MnDOT project built to capture and hold highway runoff before it's released into…
Aerial View of Shaft Construction Near Homes at the I-35W Stormwater Facility
This excavation is part of the I-35W Stormwater Storage Facility, a Minnesota Department of Transportation project built to capture and…
Cranes Rise Over I-35W During Stormwater Facility Construction
Interstate 35W cuts through south Minneapolis on a below-grade alignment, separated from adjacent neighborhoods by long concrete sound walls. The…
Scaffold Tower Rising Through a Shaft at the I-35W Stormwater Facility
The I-35W Stormwater Storage Facility in Minneapolis is an underground concrete cistern built to hold runoff from the surrounding highway…
Rebar-Formed Tunnel Section, I-35W Stormwater Storage Facility, Minneapolis
This passage is part of the underground stormwater storage facility built along I-35W in Minneapolis as part of MnDOT's freeway…
Nearby Photos



