Map
More from I-35W Stormwater Storage Facility
Cat Excavator Breaks Through to Tunnel at I-35W Stormwater Facility
This underground chamber is part of the I-35W stormwater storage facility, a Minnesota Department of Transportation project built to hold…
Scaffold Tower Rising Through a Shaft at the I-35W Stormwater Facility
The I-35W Stormwater Storage Facility in Minneapolis is an underground concrete cistern built to hold runoff from the surrounding highway…
Excavator Beside Rubble in I-35W Stormwater Tunnel, Minneapolis
The I-35W Stormwater Storage Facility is a MnDOT project built to capture and hold highway runoff before it's released into…
Aerial View of Shaft Construction Near Homes at the I-35W Stormwater Facility
This excavation is part of the I-35W Stormwater Storage Facility, a Minnesota Department of Transportation project built to capture and…
Scissor Lift Inside Rebar-Framed Chamber, I-35W Stormwater Storage Facility
The I-35W Stormwater Storage Facility is an underground rock tunnel system built by the Minnesota Department of Transportation to manage…
Hydraulic Breaker Attachment Inside the I-35W Stormwater Facility
The I-35W Stormwater Storage Facility is an underground detention system built by the Minnesota Department of Transportation to capture and…
Nearby Photos



