Excavator Beside Rubble in I-35W Stormwater Tunnel, Minneapolis

Yellow excavator positioned inside a concrete tunnel lined with rock debris and construction equipment during I-35W Stormwater Storage Facility work.
Yellow excavator positioned inside a concrete tunnel lined with rock debris and construction equipment during I-35W Stormwater Storage Facility work.

The I-35W Stormwater Storage Facility is a MnDOT project built to capture and hold highway runoff before it's released into the municipal drainage system.

Taken February 2022

Map
Nearby Photos