Cat Excavator Breaks Through to Tunnel at I-35W Stormwater Facility
Taken February 2022
This underground chamber is part of the I-35W stormwater storage facility, a Minnesota Department of Transportation project built to hold runoff from the freeway corridor before it's released into the city's stormwater system.
Taken February 2022
More from
I-35W Stormwater Storage Facility
Scaffold Ladder Rising Inside a Shaft at the I-35W Stormwater Facility
This concrete shaft forms part of the I-35W Stormwater Storage Facility in Minneapolis, a underground system built to hold excess…
Aerial of Shaft Sites Along I-35W Through Kingfield
MnDOT built this stormwater storage facility along I-35W between downtown Minneapolis and the Crosstown interchange as part of the freeway's…
Looking Up Through a Shaft at the I-35W Stormwater Storage Facility
The I-35W stormwater storage facility is a large underground vault built by the Minnesota Department of Transportation to capture and…
Cat Excavators Framed by a Blasted Concrete Opening, I-35W Stormwater Facility
The I-35W Stormwater Storage Facility is a Minnesota Department of Transportation project built to hold runoff from the highway corridor…
Overhead View of a Shaft at the I-35W Stormwater Storage Facility
The I-35W Stormwater Storage Facility sits beneath downtown Minneapolis as part of the Minnesota Department of Transportation's broader I-35W corridor…
Night View of a Tower Crane From Inside the I-35W Stormwater Shaft
The I-35W Stormwater Storage Facility is a underground storage system built by the Minnesota Department of Transportation to capture runoff…



