Yard Sign Teases METRO Green Line Extension Opening Date
Taken
Taken
A sign mentioning a September 26, 2026 event where Metro Transit will announce the opening date of the Green Line Extension. The project has been almost ten years in the making.
Taken
More from
METRO Green Line Extension (Southwest LRT)
Rail Crossing Sign at Bassett Creek Valley Station at Night
A railroad crossing sign stands in front of the new Bassett Creek Valley Station in Minneapolis at dusk. The station…
Cedar Lake Trail ripped up during train construction
The Cedar Lake Trail in the early days of the METRO Green Line Extension light rail project. The new line…
Bridge Construction Along the Kenilworth Channel
The Kenilworth Channel connects Cedar Lake and Lake of the Isles in Minneapolis, carrying both water traffic and the Kenilworth…
Stenciled "2-2768T" Tie Plate for Southwest LRT Car CS2788
This tie plate, stenciled 2-2768T and tagged for car CS2788 Truck 2 West, is part of the rail hardware inventory…
Construction at the Lake Street Bridge Over the Midtown Greenway
The Midtown Greenway runs along a former Milwaukee Road rail corridor that was converted into a pedestrian and bicycle trail…
Bryn Mawr Station Platform Under Construction at Dusk
Bryn Mawr Station in Minneapolis is shown at sunset. This station is a part of the Metro Transit Green Line…



