Barricades at Stone Arch Bridge’s Overnight Closure, Minneapolis Skyline Beyond

Orange construction signage announces overnight closure of the Stone Arch Bridge in Minneapolis from June 30 to July 5, 10 PM to 6 AM.
Orange construction signage announces overnight closure of the Stone Arch Bridge in Minneapolis from June 30 to July 5, 10 PM to 6 AM.

Temporary signage indicates overnight closures of the Stone Arch Bridge in Downtown Minneapolis from June 30 to July 5, between 10 PM and 6 AM.

Taken June 2023

Map
Nearby Photos