Cranes Over I-35W Stormwater Storage Facility, Minneapolis Skyline Beyond

Interstate 35W stormwater storage tunnel construction with cranes and concrete wall barrier alongside active highway.
Interstate 35W stormwater storage tunnel construction with cranes and concrete wall barrier alongside active highway.

The I-35W Stormwater Storage Facility runs alongside the freeway just south of downtown Minneapolis, part of a Minnesota Department of Transportation project to capture and hold runoff before it reaches the Mississippi River. Crews built the facility using large-diameter shafts bored into bedrock, connected by tunnels designed to store millions of gallons of water during heavy rain events. The project was undertaken alongside a broader I-35W corridor upgrade that added transit and bicycle infrastructure between downtown and the southern suburbs. Downtown Minneapolis, including the IDS Center and Wells Fargo Center towers, sits a few miles north along the same freeway corridor.

Photo taken in February 2022.

Map
Related Posts
Nearby Photos

Built in Minneapolis

Minneapolis Photographer

Browse by location, move through long-running series, or start with recent work.