Formwork Shoring on the Southwest LRT Bridge Over Excelsior Blvd
Taken
Taken
This bridge carries the Southwest Light Rail Transit extension, also known as the Green Line Extension, over Excelsior Boulevard in St. Louis Park. The project adds roughly 14.5 miles of track connecting downtown Minneapolis to Eden Prairie, with stops planned throughout St. Louis Park, Hopkins, Minnetonka, and Eden Prairie. The Metropolitan Council oversees construction, which involves building new bridges and retaining walls along the corridor to carry trains over existing roads and rail lines.
Taken
More from
METRO Green Line Extension (Southwest LRT)
Welders Work Pipeline Near Bryn Mawr Station at Dusk
The Southwest LRT Green Line extension is a light-rail project adding roughly 14.5 miles of track between Minneapolis and Eden…
Cyclist Passes Metro Transit Test Train at Cedar Lake Trail Tunnel
Biker goes through the Cedar Lake Trail tunnel at Louisiana Station as Metro Transit announces June 12, 2027 as opening…
Test Train 313A on the Green Line Extension Near Royalston Avenue
Metro Transit Test Train 313A moves between Royalston Ave and Bryn Mawr Station on the new Green Line Extension route.…
Passengers Boarding a Green Line Train at Louisiana Station
People check out new Metro Green Line Extension trains at Louisiana Station where Metro Transit announced June 12, 2027 as…
John Deere Feller Buncher at Southwest LRT Construction, St. Louis Park
A John Deere feller buncher, a heavy-duty forestry machine, is parked at the Southwest Light Rail Transit (LRT) construction site…
West Lake Street Station on the Metro Green Line Extension Lit At Night
West Lake Street Station is a light rail stop on the Metro Green Line Extension in the Kenilworth area of…



