Grove Crane Staged on the Kenilworth Trail for Southwest LRT Work
Taken
Taken
This Grove RT600E rough-terrain crane, operated by C.S. McCrossan, was staged along the Kenilworth Trail during construction of Metro Transit's Southwest LRT Green Line Extension. The crane can lift up to 60 tons and extend a boom beyond 100 feet, making it suited for setting bridge and tunnel components along the corridor. The Kenilworth corridor carries freight rail and a recreational trail between the Chain of Lakes and downtown Minneapolis, and became a major staging area for the light-rail line's tunnel and bridge work. C.S. McCrossan, a Minnesota-based heavy civil contractor, has worked on multiple segments of the Southwest LRT project.
Taken
More from
METRO Green Line Extension (Southwest LRT)
Light Rail Testing at Sunset on the Green Line Extension
A Siemens S700 light rail vehicle for Metro Transit’s Green Line Extension passes beneath a cable-stayed station canopy in Minneapolis.…
Cedar Lake Trail Closing and a Freight Train
A freight train travels down the freight rails during the early days of the Metro Green Line Extension project.
Night Construction of the Cedar Lake Trail Tunnel at Wooddale Avenue
The Cedar Lake Trail tunnel carries the regional bike and pedestrian path beneath Wooddale Avenue in St. Louis Park. The…
Southwest LRT Train Emerges from the Kenilworth Tunnel in Fall
A light rail vehicle enters the Kenilworth Tunnel on the Southwest LRT Green Line extension in Minneapolis. The image shows…
Steaming Mulch Piles Along the Midtown Greenway at Night
Steaming mulch seen on the Midtown Greenway during Metro Transit's light rail construction work.
Cedar Lake Trail closing over Minnehaha Creek
The bridge over Minnehaha Creek on the Cedar Lake Trail during Metro Green Line Extension construction.



