March 12, 2019 — Parking ramp construction at Minneapolis–Saint Paul International Airport in Bloomington, Minnesota, shows a multi-level concrete structure under active assembly with formwork, rebar, temporary weather protection, and a tower crane on site. The project expands airport parking capacity near the terminal area, part of MSP’s ground-access infrastructure for passengers and airport operations. Visible concrete pours and structural framing place the work in an intermediate construction phase as additional levels and deck sections were being built in March 2019.March 12, 2019 — A parking ramp under construction at Minneapolis–Saint Paul International Airport in Bloomington, Minnesota, in March 2019. The structure is shown in an active building phase, with exposed concrete floors, temporary formwork, scaffolding, and plastic weather protection in place. The project was part of ongoing airport redevelopment and expansion work to increase parking capacity for MSP travelers.March 12, 2019 — Construction of a new parking garage at Minneapolis-St. Paul International Airport (MSP) is underway, as indicated by the extensive concrete framework and towering cranes. This project is part of the airport's ongoing development to accommodate increasing passenger traffic and improve traveler experience. The construction site, covered in snow, suggests the work is proceeding through winter months. Once completed, the garage will provide essential parking facilities, supporting the airport's role as a major transportation hub for the Twin Cities region and beyond.March 12, 2019 — A crisis hotline sign is posted on the upper level of a parking ramp at Minneapolis–Saint Paul International Airport in Bloomington, Minnesota. The sign directs people in crisis to call 911 and lists the National Lifeline, a TTY number, and a statewide crisis hotline. In the background, airport roadways, the terminal connector, and an adjacent parking structure under construction show ongoing expansion work at MSP in March 2019.March 12, 2019 — Minneapolis–Saint Paul International Airport in Bloomington, Minnesota, is shown at night in March 2019, with terminal structures in the foreground and airfield lighting extending across the snow-covered apron and runways. MSP is the primary commercial airport for the Twin Cities and a major Upper Midwest hub for passenger and cargo traffic. The terminal complex includes enclosed roadway and parking connections designed for year-round operation in winter conditions, which remained visible across the airport at the time.March 12, 2019 — Parking ramp construction at Minneapolis–Saint Paul International Airport in Bloomington, Minnesota, is shown beside a terminal roadway in March 2019. The project expanded airport parking capacity with a multi-level concrete structure under active construction, including a spiral vehicle ramp and tower crane operating above the site. Aircraft gates and airfield lighting are visible beyond the terminal complex, placing the work within MSP’s terminal-side redevelopment area.
Built in Minneapolis
Minneapolis Photographer
Browse by location, move through long-running series, or start with recent work.