Halloween Bike Ride on Hennepin Avenue’s New Lanes
Taken November 2025
Bikers rolling down the new Hennepin Avenue bike lanes in Uptown Minneapolis near Lagoon Avenue on a early November 2025 evening. The road had been closed for years as the entire road was rebuilt bringing among other things, the much needed bike lanes. Also shown are people walking in the new sidewalk next to the new bike lanes.
Taken November 2025
More from
Hennepin Avenue Road Construction
Evening B Line Bus at Hennepin and Lagoon Avenues in Uptown
A Metro Transit B Line bus travels along Hennepin Avenue at its intersection with Lagoon Avenue in Uptown Minneapolis. The…
"Thank You Construction Crews" Skeletons In a Tree on Hennepin Avenue
Amid the long-running Hennepin Avenue reconstruction, residents added a dose of humor and gratitude by dressing Halloween skeletons in reflective…
Uptown Minneapolis Intersection in December Fog
The intersection of Lagoon Avenue and Hennepin Avenue in Uptown Minneapolis is seen on a foggy December night. The Uptown…
Road Closed Barricades on Hennepin Avenue in Uptown
Hennepin Avenue in Uptown Minneapolis is undergoing a major road reconstruction project. This infrastructure upgrade involves excavating the existing roadway…
Old Ford Pickup on Hennepin Avenue Construction, Uptown Minneapolis
An old Ford pickup truck navigates Hennepin Avenue in Uptown Minneapolis, a significant urban corridor currently undergoing extensive road construction.
Caution Tape Surrounds the Old Juut Salon Building at Night
New green painting on what is to become a dispensary in the former Juut Salon space at Hennepin and Lake…



