
Taylor Swift fans wait for a train outsdie the stadium in Minneapolis. Included in the Minneapolis Uprising archive, filed in the June 2023 album, documenting events following the May 25, 2020 murder of George Floyd.
Marcy-Holmes, Minneapolis, Minnesota, United States
Photo taken in June 2023. © Chad Davis
Nearby Photos
-
-
-
.1 billion stadium remains one of the most technically ambitious indoor venues in North America, notable for its fixed-roof design, massive glass curtain walls, and precision-engineered support cranes like the red lattice boom seen here — used to hoist the roof trusses into place during overnight construction sessions." loading="lazy" srcset="https://chaddavis.photography/wp-content/uploads/2015/07/us-bank-stadium-construction-cranes-768x512.jpg 768w, https://chaddavis.photography/wp-content/uploads/2015/07/us-bank-stadium-construction-cranes-300x200.jpg 300w, https://chaddavis.photography/wp-content/uploads/2015/07/us-bank-stadium-construction-cranes-1200x800.jpg 1200w, https://chaddavis.photography/wp-content/uploads/2015/07/us-bank-stadium-construction-cranes-341x227.jpg 341w, https://chaddavis.photography/wp-content/uploads/2015/07/us-bank-stadium-construction-cranes-60x40.jpg 60w, https://chaddavis.photography/wp-content/uploads/2015/07/us-bank-stadium-construction-cranes.jpg 1400w, https://chaddavis.photography/wp-content/uploads/2015/07/us-bank-stadium-construction-cranes-300x200@2x.jpg 600w" sizes="auto, (max-width: 768px) 100vw, 768px" title="Construction of U.S. Bank Stadium’s Steel Frame, Minneapolis, 3">




Filed Under: