Photo Set
I-35W Stormwater Storage Facility
I-35WMinneapolis, MN
The MnDOT I-35W Stormwater Storage Facility is a large-scale underground detention system built beneath the eastern shoulder of Interstate 35W as it runs through the Kingfield and Field neighborhoods of south Minneapolis.
The project addresses a long-standing drainage problem along this stretch of freeway, where runoff from the corridor had overwhelmed the city's combined sewer infrastructure during heavy rain events and threatened to push untreated stormwater into the Mississippi River watershed. MnDOT designed the system around a series of large-diameter vertical shafts bored into bedrock along the highway's shoulder, connected to blasted tunnels running below grade. That approach allowed a high-capacity reservoir to be installed within a dense residential corridor without acquiring additional surface land.
View full post: Overhead View of a Shaft at the I-35W Stormwater Storage Facility
View full post: Aerial View of Shaft Construction Near Homes at the I-35W Stormwater Facility
View full post: Aerial of I-35W Stormwater Facility with Downtown Minneapolis on the Horizon
View full post: Aerial of Shaft Sites Along I-35W Through Kingfield
View full post: Stormwater Shafts Rise Along I-35W with Minneapolis Skyline Beyond
View full post: Aerial View of Shaft Construction Along I-35W in Minneapolis
View full post: Crane Towers Over I-35W Traffic Near Downtown Minneapolis
View full post: Cranes Rise Over I-35W During Stormwater Facility Construction
View full post: Cat Excavator Breaks Through to Tunnel at I-35W Stormwater Facility
View full post: Hydraulic Breaker Attachment Inside the I-35W Stormwater Facility
View full post: Cat Excavators Framed by a Blasted Concrete Opening, I-35W Stormwater Facility
View full post: Night View of a Tower Crane From Inside the I-35W Stormwater Shaft
View full post: Rebar Cage Close-Up at the I-35W Stormwater Storage Facility
View full post: Scaffold Ladder Rising Inside a Shaft at the I-35W Stormwater Facility
View full post: Rebar-Formed Tunnel Section, I-35W Stormwater Storage Facility, Minneapolis
View full post: Scaffold Tower Rising Through a Shaft at the I-35W Stormwater Facility
View full post: Scissor Lift Inside Rebar-Framed Chamber, I-35W Stormwater Storage Facility
View full post: Twin CAT Excavators Inside Blasted Tunnel at I-35W Stormwater Facility
View full post: Looking Up Through a Shaft at the I-35W Stormwater Facility
View full post: Excavator Beside Rubble in I-35W Stormwater Tunnel, Minneapolis
View full post: Looking Up Through a Shaft at the I-35W Stormwater Storage Facility