Downtown Minneapolis Construction in Frigid Temperatures

Construction continues on the Third Avenue Bridge in downtown Minneapolis during frigid winter conditions, with temperatures reaching -15°F. The image shows multiple tower cranes actively working on the bridge's structure, illuminated against the night sky. Steam rises from the nearby Mississippi River, adding to the atmospheric conditions of the construction site. This project is part of ongoing development in the Minneapolis cityscape, reflecting the city's continuous growth and infrastructure investment.
Construction continues on the Third Avenue Bridge in downtown Minneapolis during frigid winter conditions, with temperatures reaching -15°F. The image shows multiple tower cranes actively working on the bridge's structure, illuminated against the night sky. Steam rises from the nearby Mississippi River, adding to the atmospheric conditions of the construction site. This project is part of ongoing development in the Minneapolis cityscape, reflecting the city's continuous growth and infrastructure investment.
Photo taken in January 2022.
Map
Tags
Nearby Photos
Related Posts

Built in Minneapolis

Photographs made over time, focused on place, public life, and ongoing reporting.

Browse by location, move through long-running series, or start with recent work.

© 1996–2026 Chad Davis