Redevelopment

31 photos · 2013–2025

31 photographs tagged Redevelopment, 2013–2025.

Pabst Brewery Complex buildings in snow-covered Milwaukee, with grain elevator and brewery tower visible.
The Pabst Brewing Company built this complex on Milwaukee's near west side starting in the 1860s, expanding it in stages as Pabst grew into the largest brewer in the United States by the late 19th century. The "Pabst" lettering on the old grain elevator and "The Brewery" sign atop the tower date from that era of continuous production. Pabst closed the Milwaukee brewery in 1996, ending more than 130 years of brewing at the site. The 21-acre complex, listed on the National Register of Historic Places, has since been redeveloped as a mixed-use district with offices, apartments, and a hotel occupying several of the former industrial buildings.

The Former Pabst Brewing Complex in Milwaukee

Interior of the Minneapolis Armory in 2013 before renovation, showing its vast barrel-vaulted space and seating areas.
The Minneapolis Armory, constructed in 1935, is a large municipal building that has served numerous purposes throughout its history. Originally built as an armory for the Minnesota National Guard, it later hosted sporting events, concerts, and public gatherings. This photograph from 2013 shows the interior before its extensive renovation into a modern concert venue. The building's distinctive barrel-vaulted roof and vast open space are visible, hinting at its past utility and future potential.

Minneapolis Armory Interior Before Renovation 2013

Demolished Star Tribune building in downtown Minneapolis with construction equipment and debris during 2015 demolition for U.S
Demolition of the former Star Tribune building in downtown Minneapolis in 2015. The building was removed to clear the site for U.S. Bank Stadium and surrounding redevelopment.

Star Tribune Building Demolition, Downtown Minneapolis

Construction in Minneapolis's Downtown East neighborhood in April 2016
Construction in Minneapolis's Downtown East neighborhood in April 2016, surrounding the development of the new US Bank Stadium. The project included the construction of the stadium itself, as well as surrounding infrastructure and commercial buildings, such as the Wells Fargo towers visible in the background.

Minneapolis Downtown East Construction April 2016

The Wells Fargo buildings in Minneapolis's Downtown East district are illuminated at dusk.
The Wells Fargo Towers in downtown Minneapolis shortly after construction. The towers were built as part of the Downtown East redevelopment along with US Bank Stadium.

Wells Fargo Buildings, Downtown East, Minneapolis

Demolition of an office building on Nicollet Mall in Minneapolis for the expansion of Westminster Presbyterian Church. The Millennium Hotel is visible.
Demolition work is underway on Nicollet Mall in downtown Minneapolis, clearing an eight-story office building to make way for an expansion of Westminster Presbyterian Church. The church, a prominent fixture in the city's core, is undertaking this project to increase its capacity and services. The adjacent Millennium Hotel is visible in the background, highlighting the ongoing development in this central business district.

Westminster Presbyterian Church Expansion, Minneapolis

A construction barrier banner on downtown Minneapolis's Nicollet Mall announces "The New Nicollet" redevelopment project opening November 2017.
Nicollet Mall is downtown Minneapolis's main street, rebuilt between 2015 and 2017. A banner on the construction fencing promised the finished project, called "The New Nicollet," would be done by November 2017.

“The New Nicollet” Construction Banner at Night

The Armory building and illuminated Wells Fargo office towers stand in downtown Minneapolis at night.
The Armory and the new Wells Fargo Towers in Downtown East, Minneapolis.

Snow-Dusted Armory Roof Beneath the Wells Fargo Towers at Night

MSP Airport 2019 Construction of Parking Garage
A parking ramp under construction at Minneapolis–Saint Paul International Airport in Bloomington, Minnesota, in March 2019.

Scaffolding and Formwork at MSP Airport’s Parking Ramp Construction

Construction of new parking ramps at MSP Airport in Bloomington, MN
Parking ramp construction at Minneapolis–Saint Paul International Airport in Bloomington, Minnesota, shows a multi-level concrete structure under active assembly with formwork, rebar, temporary weather protection, and a tower crane on site. The project expands airport parking capacity near the terminal area.

Rebar and Formwork at Night During MSP Parking Ramp Construction

Harris Machinery Building in Minneapolis is braced with temporary steel supports during redevelopment.
The former Harris Machinery Building in Minneapolis's Prospect Park neighborhood is being stabilized during redevelopment for The Market at Malcolm Yards. Temporary steel bracing supports the brick structure while work continues on the site.

Harris Machinery Building Stabilization, Minneapolis

We are rebuilding sign
Rebuilding efforts are underway on Minnehaha Avenue in Minneapolis, as indicated by a sign from Wellington Management. This particular block suffered substantial arson damage during the civil unrest that occurred in the city. The sign thanks various community organizations, including the Longfellow Business Association and Lake Street Council, for their support and generosity in the redevelopment process. This initiative reflects a collaborative commitment to restoring and revitalizing the urban environment following the historical events.

Wellington Management Rebuilding Minnehaha Ave, Minneapolis

Demolition of US Bank on West Lake Street
The demolition of a US Bank branch on West Lake Street in Minneapolis is shown at night. This branch sustained damage during the Minneapolis Uprising, leading to its subsequent removal. The site was cleared for the construction of a new bank building, reflecting the broader redevelopment efforts in the area.

Night Demolition of US Bank, West Lake Street, Minneapolis

Rebuilt AutoZone store on Lake Street in Minneapolis
The AutoZone on W. Lake Street in Minneapolis is shown under winter construction cover, signifying its rebuilding after damage sustained during the 2020 civil unrest. While another AutoZone location on East Lake Street was the first building to burn, this W. Lake Street store represents the initial complete reconstruction effort in the area. The rebuilding of businesses like this AutoZone is a key aspect of the ongoing redevelopment and recovery of the Lake Street corridor.

Rebuilt AutoZone on W. Lake Street, Minneapolis, Under Winter Cover

Midtown Corner rebuild after Minneapolis riots
Construction continues on the Midtown Corner apartment building in Minneapolis during the winter of 2020. The six-story structure, located a block from the Minneapolis Police Department's Third Precinct, was still under construction when it sustained damage during civil unrest in the summer of 2020.

Midtown Corner Rebuild, Minneapolis, Winter 2020

Cub Foods grand opening after riots
The Cub Foods store in South Minneapolis is shown here during its grand reopening after being damaged during the civil unrest following the death of George Floyd in May 2020. This grocery store, a vital community resource, is located a block from the Minneapolis Police Department's 3rd precinct station, which was a focal point of protests. The reopening signifies a step towards recovery and rebuilding for the neighborhood.

Cub Foods Grand Opening in South Minneapolis After Riots

Redeveloped riot damaged building
Construction of a new apartment development is underway at 112 East Lake Street in Minneapolis. The site was previously occupied by a tobacco shop that was destroyed during the civil unrest of 2020.

Apartment Development at 112 East Lake Street, Minneapolis

Lightning over a Minneapolis apartment building under construction at night.
Lightning above new apartment development in Uptown Minneapolis seen in May 2022.

Lightning over Minneapolis development

Highlight Center, a repurposed General Mills grain elevator facility in Northeast Minneapolis.
The Highlight Center occupies a former grain elevator complex in Northeast Minneapolis, built to store and process grain for regional milling operations. General Mills once operated the facility as part of its industrial network before the property fell out of use for agricultural processing. Developers later converted the concrete silos and headhouse into commercial office and creative space, retaining the original structure's tanks and tower as the building's defining architecture.

Highlight Center Grain Elevator, Northeast Minneapolis

Police cars outside Varsity Theater in Minneapolis during Dave Chappelle shows.
Police vehicles were stationed outside the Varsity Theater in Minneapolis on July 20, 2022, during the first night of a sold-out engagement by comedian Dave Chappelle. The Varsity Theater, a historic venue in the Dinkytown neighborhood, has a long-standing reputation for hosting live performances and film screenings. The visible police presence suggests a heightened security measure, possibly in response to past controversies surrounding Chappelle's performances or general public safety concerns.

Dave Chappelle Show, Police Cars at Varsity Theater, Minneapolis

Bus shelter in the rain on Hennepin Ave in Uptown Minneapolis
Construction continues on Hennepin Avenue in Uptown Minneapolis, a district known for its vibrant commercial and residential character. The development of a new seven-story apartment building signifies ongoing investment and transformation in the neighborhood.

Hennepin Avenue Construction in Uptown Minneapolis at Dusk

Newly built United States Post Office in South Minneapolis
The new Lake Street Station Post Office in South Minneapolis. This facility replaced the previous post office that was destroyed during the civil unrest following the murder of George Floyd on May 25, 2020. The rebuilding of this essential public service infrastructure in the South Minneapolis community underscores a commitment to recovery and continuity.

Lake Street Station Post Office, South Minneapolis

Newly built US post office with green grass
The United States Post Office in Minneapolis, rebuilt after its destruction during the civil unrest following the murder of George Floyd in 2020. The original post office, located near the Minneapolis police third precinct, was among the structures damaged during the protests.

New US Post Office on Minnehaha Avenue at Dusk

Minneapolis Police 3rd Precinct building on Minnehaha Avenue with "site cleanup begins spring/summer 2024" banner and protective fencing.
The Minneapolis Police Third Precinct building, located on Minnehaha Avenue, is slated for cleanup and fencing removal in spring/summer 2024. The site has remained largely inactive since the precinct was set ablaze during protests in the summer of 2020, following the murder of George Floyd.

“Site Cleanup Begins” Sign at the Minneapolis 3rd Precinct

A blue sign announces "Cleanup efforts are underway" at the Minneapolis Police Department's Third Precinct building surrounded by concrete barricades and razor wire.
Workers remove razor wire from the Minneapolis Police Department's Third Precinct building, which was damaged during protests following the murder of George Floyd in 2020. The precinct was subsequently fortified with concrete barricades and razor wire.

“Cleanup Efforts Are Underway” Sign at the Minneapolis 3rd Precinct

Worker removes razor wire barriers from the Minneapolis Police Department's Third Precinct building exterior.
Workers remove razor wire from the exterior of the Minneapolis Police Department's Third Precinct building. The precinct was heavily damaged by fire during protests following the murder of George Floyd in May 2020.

Clearing Razor Wire Outside Minneapolis Third Precinct

Concrete barriers and metal fencing surround the Minneapolis Police Third Precinct building site undergoing redevelopment.
Construction fencing and concrete barriers surround the Minneapolis Police Third Precinct building, which is undergoing redevelopment. The precinct was damaged by fire during protests following the murder of George Floyd in May 2020. The city plans to transform the site into a "Democracy Center" intended to house election services and community spaces.

Concrete Barriers Around the Third Precinct Construction Site

Construction continues on new Minneapolis police station
Construction of New Minneapolis First Precinct Police Station in Downtown Minneapolis. This facility replaces the previous First Precinct building located a mile away.

Site Work at the New Minneapolis 1st Precinct Station

Construction and plywood at burned Minneapolis police station
Construction is underway at the former Minneapolis Police 3rd Precinct station in Minneapolis. The building sustained significant damage during protests in May 2020, which erupted following the murder of George Floyd.

Construction at burned Minneapolis 3rd Precinct station

Boarded and damaged front vestibule of Minneapolis Police 3rd Precinct station during structural removal.
The Minneapolis Police 3rd Precinct station at 3000 Minnehaha Avenue has sat vacant since it burned during the unrest that followed George Floyd's killing in May 2020.

Rebuilding the Former Minneapolis 3rd Precinct Station

Pillsbury A-Mill on the Mississippi River in Minneapolis, with its rooftop flour sign above the former mill complex.
The Pillsbury A-Mill stands on the east bank of the Mississippi River in Minneapolis, with its rooftop “Pillsbury’s Best Flour” sign visible above the former milling complex. Completed in 1881, the mill was a major part of the flour industry that grew around nearby St. Anthony Falls, where water power drove large-scale grain processing. The brick industrial buildings are seen alongside newer residential towers and the St. Anthony Falls Laboratory, showing the mix of historic industry, research facilities, and redevelopment along the riverfront.

Pillsbury’s Best Flour Sign at Sunset Along the Mississippi River

Built in Minneapolis

Minneapolis Photographer

Browse by location, move through long-running series, or start with recent work.