Originally built in 1905 with substantial repairs done over the years, the Lowry Avenue Bridge was closed on April 25, 2008. Controlled explosions demolished it on June 21, 2009.
Captured on February 4, 2009.
© Chad Davis | [email protected]
Originally built in 1905 with substantial repairs done over the years, the Lowry Avenue Bridge was closed on April 25, 2008. Controlled explosions demolished it on June 21, 2009.
Captured on February 4, 2009.
© Chad Davis | [email protected]