Cat Excavators Framed by a Blasted Concrete Opening, I-35W Stormwater Facility

Yellow Caterpillar excavators operate inside a concrete tunnel at the I-35W Stormwater Storage Facility in Minneapolis.
Yellow Caterpillar excavators operate inside a concrete tunnel at the I-35W Stormwater Storage Facility in Minneapolis.

The I-35W Stormwater Storage Facility is a Minnesota Department of Transportation project built to hold runoff from the highway corridor before it's released into the city's sewer system, reducing flood risk in surrounding neighborhoods.

Taken February 2022

Map
Nearby Photos