Construction on the 24th Street pedestrian bridge over I-35W.
Taken on April 30, 2020
ILCE-7RM4 + FE 50mm F1.8 @ 50mm f/10 1/80 sec. ISO125
Contact: [email protected]
© 2021 Chad Davis
Construction on the 24th Street pedestrian bridge over I-35W.
Taken on April 30, 2020
ILCE-7RM4 + FE 50mm F1.8 @ 50mm f/10 1/80 sec. ISO125
Contact: [email protected]
© 2021 Chad Davis